Evaps Removal Project
Robey Engineering Solutions recently undertook a client project to remove evaporator equipment and associated pipe work from third to ground floor, approximately twenty-two meters through all floors. Our engineers and operatives completed the project on time and within the agreed budget whilst undertaking the works in extreme temperatures and, where possible, outside of normal working hours as it was a cooler work environment and to fit with client requirements.
We collaborated effectively with the client and other trades to ensure the project was completed on time and safely. This project was located inside a factory, requiring constant high hygiene and engineering standards throughout.
All sections were plasma or disc cut into manageable sections and removed via winch or by the goods lift.
Project Value
Original Tendered Sum: £92,538.40
Variations Total: £37,144.70
Final Project Value: £129,683.10