New Pasteuriser and Incubation
Tank Project

Robey Engineering Solutions (RES) successfully delivered labour, plant, and equipment for the Pasteuriser 3 and Incubation Project, a 12-month contract completed on time and within budget. Throughout the project, RES maintained an average team of six skilled tradespeople, supported by approved subcontractors.

 

 

Site Establishment & Set-Up

 

RES managed the full site establishment for the duration of the project, which included:

 

  • 2 secure storage containers

  • 1 fully equipped site office/mess room

  • 1 on-site workshop facility

 

This setup provided a safe, efficient base of operations for the project’s delivery.

 

 

Equipment Offloading & Installation

 

RES coordinated the offloading and installation of incubation tanks, pasteuriser units, and associated equipment.

 

  • A crane and small plant machinery were used to manage the complex lift and placement operations.

  • Tight working areas and challenging schedules were overcome through close collaboration with contract lift suppliers.

 

 

Process Pipework Fabrication & Installation

 

Our team fabricated and installed process pipework connecting to all associated equipment.

 

  • Orbital welding techniques were used to ensure compliance with strict site standards and specifications.

  • Most pipework was routed through roof voids, dropping down to connect equipment precisely where required.

  • Careful scheduling of system break-ins ensured production continued safely without interruption, coordinated closely with the client’s team.

 

 

High-Level Access Platform

 

RES also designed, manufactured, and installed a new incubation access platform to Execution Class II (ISO 1090).

 

  • The platform was installed within a live production area with minimal disruption.

  • Due to limited footprint and restricted access, a contract lift was used to complete the installation safely and efficiently.

 

 

Project Value

 

  • Original tendered sum: £893,946.00

  • Variations total: £349,418.00

  • Final project value: £1,243,364.00

Incubation Assembly
Pasteuriser Assembly
Unloading Equipment
Place Vessel into Position
Process Pipework
Robey Site Establishment
High Level Platform

Registered in England, No. 11159030

Registered Office

7 Faraday Court, First Avenue, Burton On Trent, Staffordshire, United Kingdom, DE14 2WX

Director

R. D. Robey (Managing Director)

Robey Engineering Logo Landscape Yellow
bottom of page